다음을 통해 공유


Create and manage tests runs in Azure Load Testing

When you run a load test, Azure Load Testing creates a test run associated with the test. Learn how to manage tests runs for a load test in Azure Load Testing.

필수 조건

  • 활성 구독이 있는 Azure 계정. Azure 구독이 없는 경우, 시작하기 전에 무료 계정을 만드십시오.
  • Azure Load Testing 리소스입니다. 부하 테스트 리소스를 만들려면 부하 테스트 만들기 및 실행을 참조하세요.

View test runs

Test runs are associated with a load test in Azure Load Testing. To view the test runs for a test in the Azure portal:

  1. In the Azure portal, and go to your load testing resource.

  2. Select Tests in the left pane, to view the list of tests.

  3. View the test runs for a test by selecting the test name in the list.

    Screenshot that shows the list of test runs for a load test in the Azure portal.

  4. Select ellipsis (...) for a test run perform more actions on the test run.

    Screenshot that shows the test run context menu in the Azure portal to download input files, results file, and share a link.

Edit a test run

You can modify a test run by adding or removing Azure app components or resource metrics. You can't update the other test configuration settings.

To view the test runs for a test in the Azure portal:

  1. In the Azure portal, and go to your load testing resource.

  2. Select Tests in the left pane, to view the list of tests.

  3. Go to the test details by selecting the test name in the list tests.

  4. Go to the test run dashboard by selecting a test run name in the list of runs.

  5. Select App Components or Configure metrics to add or remove app components or resource metrics.

    The test run dashboard automatically reflects the updates to app components and metrics.

    Screenshot that shows how to configure app components and resource metrics for a test run in the Azure portal.

Rerun a test run

When you rerun a test run, Azure Load Testing uses the test configuration that is associated with the test run. If you've made changes to the configuration of the test afterwards, those changes aren't taken into account for rerunning the test run.

To rerun a test run in the Azure portal:

  1. In the Azure portal, and go to your load testing resource.

  2. Select Tests in the left pane, to view the list of tests.

  3. Go to the test details by selecting the test name in the list tests.

  4. Go to the test run dashboard by selecting a test run name in the list of runs.

  5. Select Rerun.

  6. In the Rerun page, optionally update the test run description and test parameters.

  7. Select Rerun to start the load test.

Stop a test run

To stop a test run in the Azure portal:

  1. In the Azure portal, and go to your load testing resource.

  2. Select Tests in the left pane, to view the list of tests.

  3. Go to the test details by selecting the test name in the list tests.

  4. Select one or more test runs from the list by checking the corresponding checkboxes.

  5. Select Delete test runs

    Alternately, go to the test run dashboard by selecting a test run name in the list of runs, and then select Delete test run.

  6. In the Delete test run page, select Delete to delete the test run.

Delete a test run

To delete a test run in the Azure portal:

  1. In the Azure portal, and go to your load testing resource.

  2. Select Tests in the left pane, to view the list of tests.

  3. Go to the test details by selecting the test name in the list tests.

  4. Select ellipsis (...)>Stop to stop a running test run.

Compare test runs

To identify performance degradation over time, you can visually compare up to five test runs in the dashboard. Learn more about comparing test runs in Azure Load Testing.

다음 단계