Note
Access to this page requires authorization. You can try signing in or changing directories.
Access to this page requires authorization. You can try changing directories.
For scripting, gets or sets the interval between the days in the schedule.
Syntax
DailyTrigger.DaysInterval As short
Property value
The interval between the days in the schedule.
Remarks
An interval of 1 produces a daily schedule. An interval of 2 produces an every-other day schedule.
When reading or writing your own XML for a task, the interval for a daily schedule is specified using the DaysInterval element of the Task Scheduler schema.
Requirements
Requirement | Value |
---|---|
Minimum supported client |
Windows Vista [desktop apps only] |
Minimum supported server |
Windows Server 2008 [desktop apps only] |
Type library |
|
DLL |
|