Note
Access to this page requires authorization. You can try signing in or changing directories.
Access to this page requires authorization. You can try changing directories.
Some more stuff to remember when dealing with self-replicating tasks. (See my earlier post for an introduction to Parallel FX and self-replicating tasks):
- Self-replicating tasks should have an inter-replica communication mechanism for communicating the progress/details of the activity. This depends on what the activity is trying to achieve. See here for an example.
- Self-replicating tasks should have an inter-replica communication mechanism for communicating the completion of the overall activity.
- Only use when the cost of this communication and the management of partitions is considerably less than the potential benefit gained from parallelism
- Do not assume that the task is always replicated. It is only replicated if there are available resources. For the same reason also, do not assume that there will be a specific number of replicas.
- In some instances, the number of replicas could far exceed the number of cores in the machine.
- You may choose to use optimistic concurrency when it is possible to correctly deal with multiple executions of the same step.
- In general replicating tasks are an advances feature that can be very useful in specific scenarios. Use with caution.
(All based on the first Parallel Extensions CTP)
Comments
- Anonymous
April 03, 2008
PingBack from http://www.travel-hilarity.com/airline_travel/?p=2429