Note
Access to this page requires authorization. You can try signing in or changing directories.
Access to this page requires authorization. You can try changing directories.
Kanban customizable columns, “under the hood”
(This blog post is also posted on the Visual Studio ALM Blog) Kanban customizable columns was made...
Date: 03/04/2013
TFS/Agile PM: Configuring so your tasks are estimated in story points
I’ve had a few people ask: “What if I estimate my tasks in something other than hours, like ideal...
Date: 09/24/2012
Team Foundation Service: Process template changes
With this latest Team Foundation Service update, we have updated the process template versions for...
Date: 09/19/2012
TFS vNext: Configuring your project to have a master backlog and sub-teams
One backlog to rule them all… One common practice we’ve seen our customers use is to have a...
Date: 01/27/2012
Work Item Tracking Custom Controls
(Many thanks to Hayder Casey, who provided this great write-up on work item tracking custom...
Date: 03/30/2010
TF252031: A SharePoint site could not be created for the team project collection. (HRESULT: 0x80040E09)
Full error message: “TF252031: A SharePoint site could not be created for the team project...
Date: 03/11/2010
What I think about the younger generation of software professionals
I have an opportunity to teach Software Project Management as a part of a University of Washington...
Date: 03/10/2010
Controlling which link types are displayed on a work item form
In 2005 and 2008 versions of TFS, the work item links control that displayed the links always showed...
Date: 03/04/2010
TFS 2010 – Customizing Work Item Link Types
(This is a re-post of information from the now deprecated blog: “Teams WIT Tools”) (3/2/2010:...
Date: 03/01/2010
Names changed for core WIT fields, and implications thereof
In work item tracking, there are several system fields that always exist in every work item type....
Date: 02/25/2010
Resolving bugs using 2005/2008 clients on TFS 2010 RC
There is an issue where 2005/2008 clients connecting to a TFS 2010 RC server, with team projects...
Date: 02/25/2010
SharePoint Integration Troubleshooting Guide
Attached to this blog post is a guide that can be used to troubleshoot problems with SharePoint...
Date: 02/25/2010
Creating SharePoint Portals, Reports, and Upgrading Reports for an existing team project
In the Release Candidate, we have added the ability to do the following: · Create a SharePoint...
Date: 02/24/2010